A Productive Day at the Office

From Advanced Squad Leader
Jump to navigationJump to search

A Productive Day at the Office

Scenario Shin4.jpg
Publication: Shingle's List
Location: Aprilia, Italy
Scenario Date: 16 February 1944
# of Turns: 5
# of Maps: 1
Maps Used: 12
Board Shin4.jpg
Attacker: American
Defender: German


Conflict

Realizing the importance of The Factory, Allied troops attempted to recapture the strategic point on 11 February without success. On 16 February, General Von Mackensen unleashed his attack from Aprilia with the intent of driving the Allies back into the sea within 72 hours. Meanwhile, Sergeant Charles W. Keyser of the US 191st Tank Battalion sat in the turret of his Sherman just south of Aprilia, trying to ease the pressure put upon the 179th Infantry Regiment. Keyser saw two Mk VI Panzers rumble out of The Factory towards him. . .

Versions


Victory Conditions

The American must eliminate German units and/or exit units


Balance


Errata

-


Analysis

-


After Action Reports

-


VASL Logs

-


Downloads

-